5 Hal yang harus diperhatikan dalam desain Airflow Containment

5 Key Considerations for Airflow Containment Design

By implementing an effective airflow containment strategy, it is possible to see optimized cooling system efficiency, improved Power Usage Effectiveness (PUE) and additional equipment capacity, all without having to expand a facility’s footprint. (Photo: Simplex)
In this week’s Voices of the Industry, Ward Patton, Critical Environment Specialist at Simplex Isolation Systems, unpacks five key considerations for airflow containment design. 
Data center containment systems can provide great benefits­ over traditional open data center designs. By implementing an effective airflow containment strategy, it is possible to see optimized cooling system efficiency, improved Power Usage Effectiveness (PUE) and additional equipment capacity, all without having to expand a facility’s footprint.
Ward Patton, Critical Environment Specialist at Simplex
Like any successful system, airflow containment design must consider many different factors to ensure a solution that achieves the required cooling, while remaining flexible for expansion or changes and integrates well with the current infrastructure. Here are five key considerations to keep in mind when planning a data center containment project.
  1. Hot Aisle or Cold Aisle Containment
Hot air and cold air containment are the two high-level methods of an airflow containment strategy, and there is an ongoing discussion in the industry about whether it makes more sense to isolate the hot aisle or the cold aisle. Different data center experts advocate different theories, but realistically, the approach should be dictated by the existing infrastructure.
For example, what is the current air distribution type in the facility? This will play a critical role in deciding which approach is the best fit. Data centers with targeted return and flooded supply air distribution would benefit more from hot aisle containment, whereas data centers with targeted supply and flood return air distribution would see better results with cold aisle containment.
Ward Patton - Data center containment systems can provide great benefits­ over traditional open data center designs.CLICK TO TWEET
Additional factors that can dictate whether to isolate the hot aisle or the cold aisle include the depth of the raised floor plenum, the presence of overhead cabling, varied ceiling heights and support column locations. These are only some of the infrastructure constraints that need to be addressed and every case is site specific. An assessment of the existing conditions of the facility is essential to choosing the right containment solution for any data center.
  1. IT Equipment Arrangement
Once the infrastructure has been evaluated, the next step is to review the current IT equipment arrangement. While most data centers are depicted having rows and rows of server racks of the same brand, shape and size, this is rarely the case. It is not uncommon to see offset rows consisting of multiple server rack brands in all number of shapes and sizes. This is especially true for legacy data centers that have undergone expansion, or are the result of the consolidation of multiple facilities.
It is also recommended to go one step further and review any ergonomic challenges. Factors such as clearance or personnel traffic should be reviewed and planned for accordingly. End-of-aisle doors for instance, should be configured to best fit the traffic patterns within the data center making the space easier to work in when moving racks and other items in and out.
When evaluating an airflow containment system, it is critical to assess the amount of customization that will be needed for the containment system to perform optimally, especially if there is a lack of uniformity with the IT equipment.  While it may seem daunting to find a containment system that can accommodate all levels of variation, most innovative manufacturers can offer a customized and flexible solution to fit any new or retrofit application.
  1. Fire Detection and Suppression
 Fire suppression in the data center is complicated and involved. It is a good policy to involve the local Fire Marshal as soon as possible when planning an airflow containment system. The Fire Marshal enforces the local codes and standards in the jurisdiction and can play a critical role in providing the insight needed to achieve compliance from the very beginning.
Fire suppression in the data center is complicated and involved. #coolingCLICK TO TWEET
Jurisdictions will require compliance with the National Fire Protection Association (NFPA) 75 and 76, which ensure that fire suppression systems are in place and meet specific testing requirements. From a containment standpoint, these standards require data center facilities who use an airflow containment system to either have a fire suppression system that covers all areas of contained aisles or a containment system that integrates with the fire detection system. The former option can be a costly and daunting task, so many data center managers will opt for a containment system that works with the current fire suppression infrastructure.
There are many reputable containment systems available today that are designed specifically for use under a fire suppression system, though potential implications associated with the containment approach will still need to be considered. Vertical containment systems that incorporate softwall curtains, for example, would need to account for the required clearance space below the sprinkler level if the facility is equipped with a sprinkler-based fire suppression system. This would insure full dispersal of water in the event of a fire. Such systems would also need to consider what softwall material is being implemented. It’s not uncommon to receive demands from the Fire Marshal to source curtain materials that meet the stringent ASTM E-84 Class 1 rating for flame and smoke generation, so researching and selecting an appropriate softwall material is important.
Systems that feature ceiling partitions rather than softwall curtains will need to address how the facility’s fire suppression system will be accommodated. These structures generally include ceiling panels that are retractable, are equipped with a soft drop system, or are designed to shrink and fall away when exposed to temperatures that reach 15 to 20 degrees lower that the temperature at which the fire sprinklers would activate.
Whatever the containment approach, there are additional factors to consider when evaluating which system is the best fit.
  • A fail-safe system is key. Look for a containment system equipped for a facility power outage or Emergency Power Off (EPO) event. While many systems may tie into a dedicated emergency back-up supply, relying on a supplemental power system can’t be deemed fail-safe. Instead, consider a system that is inherently fail-safe, such as a gravity-reliant, electromagnetic droplink that would drop away when the power source is disconnected.  That way the fire suppression system would still operate successfully in the event of a power outage.
  • Consider equipment and personnel safety. Look for a system that won’t cause additional damage to equipment or prove harmful to personnel if deployed. Curtain systems for instance, should be equipped with a lanyard drop system and ceiling structures should retract or have a soft-drop feature to prevent damage when they are utilized.
  • Testability. Look for a system that can be tested and reset in the event of deployment. This is a requirement for NFPA 75 compliance.
When it comes to prevention against a fire within the data center, any costs related to risk mitigation will be justified when compared to the cost of damage that would be incurred in the event of an actual fire.
  1. Electrical Utility Incentives
There is a good chance that your electrical utility provider has a system of rebates and incentives for companies that take proactive measures to decrease power usage in their data centers. The utility might have certain stipulations in place such as approved contractors, approved equipment and other requirements. Take these considerations into account as you begin the design process, rather than after the airflow containment project is underway. There are often specific time windows to take advantage of these incentives. 
  1. Future Growth
 Understand that change is unavoidable and design the airflow containment based on that reality. Eventually changes in the data center will be required to accommodate growth or reconfigure the layout. When evaluating an airflow containment system, it makes sense to look for components and structures that are modular in design. Modular mounting hardware for curtains and modular end-of-aisle doors, for example, can be relocated or expanded upon if needed. Ultimately, containment systems that are modular in design will have a lower cost of ownership.
Overall, data centers are complicated and there are many factors that come into play when designing an effective airflow containment solution. When making plans for airflow containment, it is recommended to work with reputable manufacturers that can analyze the space and align airflow and containment objectives with the data center’s site-specific infrastructure and equipment requirements to secure the greatest efficiencies and enable modular, scalable and affordable growth.
Ward Patton is the Critical Environment Specialist at Simplex Isolation Systems. Simplex Isolation Systems designs and manufactures custom data center containment systems that are modular, expandable and high-performing. Simplex’s Containment Resource Guide can serve as an essential tool for planning a hot or cold aisle containment system.

Friday, June 09, 2017

Redesign Your ITSM Tool RFP Process for Better Results



LICENSED FOR DISTRIBUTION

Redesign Your ITSM Tool RFP Process for Better Results

Published: 04 May 2017 ID: G00327683
Analyst(s):
 

Summary

Choosing the right IT service management tool is difficult due to a market crowded with more than 450 products and increased commoditization. This research helps I&O leaders enhance the RFP process to compel vendors to explain why their offering is best for the business.

Overview

Key Challenges

  • Because they are unable to specify which functions of IT service management (ITSM) tools are vital to their business, I&O leaders struggle to identify the best tools for their needs and rely too heavily on price comparisons.
  • RFPs for ITSM tools often include requirements that apply only to certain delivery methods, such as SaaS or on-premises, creating bias that makes it challenging to compare tools delivered in different ways.
  • ITSM tool RFPs do little to help I&O leaders differentiate vendor offerings because they often are merely long lists of commonly found features.
  • Instead of addressing an organization's specific needs, ITSM vendors often provide boilerplate responses to RFPs, making it difficult for I&O leaders to select the right tool.

Recommendations

I&O leaders focused on optimizing IT operations to drive business value:
  • Distinguish crucial requirements from nice-to-have features by performing a "must have, should have, could have, won't have yet" (MoSCoW) analysis during the definition phase, and by asking vendors to complete a prequalification questionnaire containing only your must-haves.
  • Ensure your RFP fits a wide range of use cases, focuses on outputs and emphasizes value. Use delivery-specific criteria when comparing SaaS offerings with on-premises offerings, or vendor-direct offerings with reseller offerings.
  • Share your vision with vendors by identifying the issues and goals that you need an ITSM tool to address and achieve, and by being candid about your current capabilities. This approach will help you identify a solution that suits both the organization's current needs and the processes you plan to implement in the near future.
  • Invite vendors to explain why their solution is best for your needs by requesting that they respond to your RFP in essay form. Essay-based responses take longer to produce than yes/no responses, and lazy vendors interested only in easy wins are likely to withdraw their bids.

Strategic Planning Assumption

By 2020, 90% of organizations that invest in an ITSM tool without factoring in their organizational and process maturity will fail to obtain the intended ROI from their investment.

Introduction

IT organizations preparing to select ITSM (see Note 1) tools typically compile a large list of requirements from multiple IT stakeholders and then add generic ITIL process references. This RFP approach results in a long list of technical questions that solicits similar answers from each bidding vendor and does very little to distinguish among offerings. 1
Requirements that loosely reference common ITIL processes are often added, even if the organization is not ready to implement them. This approach frequently results in the selection of a vendor and product based on criteria that are not important to the organization. In addition, the organization may wind up paying for features that won't be used. (See "IT Service Support Management Tool Acquisitions Must Be Based on I&O Maturity." )
Gartner analysts have also encountered prospective buyers reusing the RFP from a previous selection process. This almost certainly means that the I&O leader has not examined the organization's current needs or growth requirements. I&O leaders often select a tool based on the assumption that they will be able to configure the new tool to behave like the old tool. This approach is unlikely to lead to the best result for the organization.
ITSM tool purchasing behavior trends indicate that, by 2020, 90% of organizations that invest in an ITSM tool without factoring in their organizational and process maturity will fail to obtain the intended ROI from their investment. 1

Analysis

Perform a MoSCoW Analysis to Distinguish Crucial Requirements

Because many vendors respond to lengthy checklist-style RFPs with almost identical, boilerplate answers, slight differences in replies tend to have a disproportionally large impact on the final scores. It is therefore of the utmost importance to ensure that your technology selection isn't based on unimportant requirements.
To avoid this pitfall, conduct a MoSCoW analysis to designate the relative priority of different feature requirements. Use the four categories shown in Figure 1.
Figure 1. Categories of a MoSCoW Analysis for ITSM Tool Features
Research image courtesy of Gartner, Inc.
Source: Gartner (May 2017)
Treat must-have requirements as pass/fail criteria. If a vendor cannot meet these requirements, you should remove that vendor from consideration, regardless of how successful it may be in the other categories. If a vendor claims it can satisfy your must-haves without customization, you need to acquire proof before letting that vendor pass to the next stage.
You can simplify the selection process by asking vendors to complete a prequalification questionnaire (PQQ) containing only your must-haves. A PQQ asks vendors to confirm that they meet all your essential requirements, but it does not require or expect them to supply detailed answers for scoring purposes. By either supplementing or supplanting a request for information (RFI), a PQQ can help you quickly eliminate incompatible vendors before starting the detailed RFP process.
However, when taking this approach, you need to ensure that your must-haves really are crucial. Double-check that none of them are actually should-haves before you begin excluding vendors. If possible, analyze the PQQs without revealing to stakeholders which vendors face elimination, so that bias doesn't affect the decision. If a vendor admits that its product cannot meet a must-have requirement without modification, but claims that the product could be customized to add that functionality in the future, treat the vendor as a fail. If all bidders are excluded on this basis, reclassify the relevant requirement as a "should-have (without customization)" and award a low score (such as two out of five) in the final scoring stage.
Once you have determined your must-haves, aim to limit your should-haves to noncommoditized functions and important, but not crucial, capabilities. I&O leaders typically place too much attention on commoditized ITSM tool features such as:
  • "Tool generates a unique ticket number for each incident."
  • "Tool can create a problem ticket from an incident."
Noncommoditized functions are more likely to be unique to your organization or industry. Consider the following examples:
  • "Mobile business user location can be dynamically determined so that the tool can automatically assign the closest on-site engineer at the time of the issue."
  • "The tool should provide a dashboard that enables support staff to prioritize incidents from a mixture of phone calls from standard users and appointment requests from doctors, so that the appointments generally take priority."
Concentrating on specific, noncommoditized functions will help to separate vendors further.
Next, limit the number of could-haves because they lengthen the process for all participants without adding value to the final decision. Could-haves should be considered only in the event of a tie between two or more bidders — after factors such as price, total cost of ownership and vendor stability have already been evaluated. You might also want to consider the vendor's roadmap as a potential tiebreaker, although you would have to pursue references indicating how well the vendor sticks to its roadmap.
Won't-have-yet requirements should be documented internally, but not on the RFP. Most RFPs that Gartner sees include requirements that are beyond the I&O organization's current capabilities.
Finally, a MoSCoW analysis requires you to assign score weightings to the different categories of requirements. You do this by assigning more weight to must-haves and should-haves, and less weight to could-haves. The weightings are discretional, but Gartner recommends the following:
  • Must-haves: 5x
  • Should-haves: 4x
  • Could-haves: 1x
Table 1 shows these weightings in action. Although Vendor 2's total unweighted scores exceed Vendor 1's, Vendor 1's total weighted scores exceed Vendor 2's due to better performance on the must-have and should-have requirements, which have higher weightings.
Table 1.   Results of Applying Suggested Weightings to Requirement Categories


Category

Priority (MoSCoW)
Vendor 1 
Score 
(0 to 5)
Vendor 1 Weighted 
Score
Vendor 2 
Score 
(0 to 5)
Vendor 1 Weighted 
Score
Requirement A
Must Have
4
20
3
15
Requirement B
Should Have
3
12
3
12
Requirement C
Should Have
3
12
2
8
Requirement D
Could Have
3
3
4
4
Requirement E
Could Have
2
2
4
4
Requirement F
Could Have
5
5
5
5
Total Company Score
20
54
21
48
Average Company Score
3.3
9
3.5
8
Source: Gartner (May 2017)

Use Delivery-Specific Criteria When Comparing SaaS Offerings With On-Premises Offerings, or Vendor-Direct Offerings With Reseller Offerings

ITSM products are available primarily as SaaS or on-premises offerings, but they can also be provided as hosted solutions. Additionally, these tools may be supplied directly by the vendor or indirectly via a reseller.
RFP processes that include a mixture of these options are common, but Gartner finds that the requirements used to compare them are often biased toward one approach. For example, traditional RFPs that include sections contributed by infrastructure staff often list technical hosting requirements, such as server OS support. Such requirements are invalid when assessing a SaaS-based bid, and make valid comparisons harder to achieve.
Also, resellers and implementers may focus more on the implementation project and may be better at restricting the service offering to the project's scope. By contrast, vendors selling direct tend to highlight the full capability of their product, even when it's not suitable for the IT organization in question. The result is that realistic promises often score lower than inappropriate claims.
When evaluating a mixture of delivery formats, change any requests and questions that do not fit all cases into higher-level requests that focus on outputs and value. Table 2 gives examples.
Table 2.   Change Requests and Questions to Focus on Outputs and Value
Before
After
  • Detail your antivirus update process and frequency on the application servers.
  • We use ACME software for intrusion detection in our infrastructure. Is the ITSM tool fully compatible with this product?
  • Explain how you guard the integrity of the service against external attack.
  • How will the software be installed?
  • Describe the high-level implementation plan for our organization.
Source: Gartner (May 2017)

Share Your Vision, Including Your Issues and Goals, With Vendors

ITSM tool vendors won't understand how to tailor their offerings to your IT organization's needs unless you:
  • Communicate your organization's progress through the various phases of IT maturity
  • Inform vendors of your issues and goals
For example, if you are using Gartner's "ITScore for Infrastructure and Operations" as a model for improving maturity, communicate your current level to vendors. Then, explain your goal for moving between levels, such as progressing from Level 2 to Level 3. To flesh out your story:
  • Focus on specific strengths associated with organizations at higher levels of maturity (for example, effective problem management processes or strong release management programs)
  • Provide a few examples of use cases to give vendors more context and a better chance to test their solutions' suitability
Often, RFPs include a list of questions that ask only, "Do you have function A? Do you have function B? Do you have function C?" Accordingly, these questions elicit a long list of basic responses like, "Yes, we do." Even when a vendor replies, "No," that response usually accompanies an explanation of how the vendor will offer the function in the future. The comments that accompany each response make it difficult to understand the extent to which the offerings will enable value. This flawed approach is commonly used when an RFP refers to ITIL processes that the IT organization aspires to, or has heard of, but has no established plan to implement. Ultimately, it produces little opportunity to differentiate between bidders.
Instead, you should identify the goals that you want a new ITSM tool to help you achieve. Ask the vendors to explain how their product will help you reach your goals. Be candid about your current capabilities and maturity, and share this information with them. Most ITSM tool contracts and subscriptions are for 36 months, so ask for a solution that suits both your current needs and your proposed changes — that is, the processes you plan to implement during the next 18 months. By taking this approach, you can avoid overinvesting in features that may not be used before the next renewal.
Consider your reasons for switching from your existing service desk tool, and ask vendors to explain how buying their product won't result in similar limitations and complaints. For example, suppose you are seeking to improve problem management and your goal is to reduce the reoccurrence of outages by 50% or more. The vendor could show how its solution would capture trending information and identify potential root causes more effectively than alternative offerings.
Although your story will not take the form of a numbered checklist, it's still advisable to use numbered points throughout. A numbering scheme will help ensure that all points are covered, because vendors will have to respond to each point. This scheme will also help your procurement department reference the answers in any ensuing contract, to make the vendor accountable for the claims that led to its selection.
This approach helps foster a longer-term relationship with the supplier, which takes some responsibility for the solution. It also creates an opportunity to tie renewal conditions and exit clauses to meaningful system performance. Vendors that are not prepared to do this are identified quickly, giving you early insight into how they would behave after a deal is done.

Implement an Essay-Style RFP to Make Vendors Explain Why Their Solution Is Best for Your Needs

Instead of just answering "yes," "no" or "partially" to the numbered items in your story, bidding vendors should respond in essay form. Request this response format when you deliver RFPs to vendors. Ensure vendors include case studies and reference examples of how they have met such requirements for other customers. The vendor's reference customers should be similar to your organization in terms of size, industry and geographic reach, so that results are comparable. Vendors should provide evidence of positive outcomes, either directly or via references.
Essay-based responses take longer to produce. Vendors that don't expect to be successful, as well as those that are interested only in easy wins, are likely to withdraw their bids. This is a risk that must be considered, but there are obvious benefits to having a shorter list of only fully committed vendors. In practice, vendors that truly want your business will seize the opportunity to respond fully. By contrast, vendors that aren't fully committed won't.
Essay-based responses also take longer for you to score. Processing them incurs more cost from a time and resource standpoint. Therefore, focus on fewer questions that, when thoroughly answered, will give you a true sense of each vendor's ability to deliver a solution that meets your needs. Consider which three questions would give you such a sense. Example requests to vendors include the following:
  • Describe and quantify how your solution will improve the efficiency with which my I&O team delivers service.
  • Describe and quantify how your solution will make my entire organization better.
  • Describe and quantify how your solution will improve the maturity of my I&O organization.
  • Describe and quantify how your solution will help me communicate the value of IT service and support to my business.
Because of the time-consuming nature of essay-style RFPs, it's especially important to limit your requirements to critical criteria, as explained above. This will keep the process as short as possible. Concentrate on getting high-value responses to the questions that really matter. When it comes to essay-style RFPs for ITSM tools, less really can be more.

Acronym Key and Glossary Terms

MoSCoWMoSCoW is a mnemonic that stands for "must have, should have, could have, won't have yet" (the lowercase o's have no representative significance). It is a business analysis technique used to categorize the priority of requirements in a project. The technique was developed by Dai Clegg of Oracle UK Consulting for rapid application development (RAD) projects in 1994, and is now officially part of the dynamic systems development method (DSDM).

Evidence

From April 2015 through April 2017, 9% of the Gartner client inquiries about ITSM tools required Gartner analysts to review RFPs, which often contained over 300 line items.

Note 1 
ITSM vs. ITSSM

Previously, Gartner used the term "IT service support management (ITSSM)" to refer to the operational tools used by IT support teams. Gartner now uses the term "IT service management (ITSM)" instead. This terminology change reflects ITSM's expanding importance to more than just support organizations. It also enables our clients to find relevant content more easily. Gartner will continue to segment ITSM tools as basic, intermediate and advanced. All active research on gartner.com that refers to "ITSSM" remains valid and should now be interpreted as describing ITSM tools.